New construction project in Lain near Lenzerheide
Quadra 11, 7082 Vaz/Obervaz
Last checked 1 hour ago 474 days on the market
At a glance
Description
3.5 room first-floor apartment on the 2nd floor with veranda and cellar In the village square of Lain, this attractive multi-family house with 7 apartments and 8 garage spaces is being built. The solid, masonry construction with clear design and attractively chosen wood elements fits optically into the village picture. With the clever cuts of the verandas, attractive outdoor areas/balconies can be created for the apartments without compromising the volumetric importance of the location. The apartments offer high-quality, contemporary architecture with bright rooms. The open floor plans allow for great flexibility in equipment and furnishings. Each apartment is supplemented with a cellar compartment on the ground floor. A roof-integrated PV system ensures sustainable energy supply. In the living area, a telebutler is available for remote control of the heating regulation. The house is equipped with preparation for e-charging stations. Construction starts in spring 2025. The expected move-in date is 01.04.2026. All details can be found on the project homepage www.lenzerheide-quadra-lain.ch. We are happy to answer any further questions or arrange a personal meeting to discuss the project. Contact us - we look forward to your interest.
Features & amenities
All characteristics
Equipment
Condition & location
Dimensions
Documents (PDF)
Location & surroundings
- Bus Vaz/Obervaz, Lain 134 m
- Bus Vaz/Obervaz, Tranter Moira 375 m
- Bus Vaz/Obervaz, Zorten 462 m
- Bus Muldain 601 m
- Heating
- Heat pump · Geothermal
- Hot water
- Heat pump · Geothermal
- Dwellings in building
- 1
- Floors
- 5
Source: FSO – Federal Register of Buildings and Dwellings (RBD) · As of 2023