RUEYRES LAST HOUSE - CONSTRUCTION STARTS SEPTEMBER 2026 !
. , 1046 Rueyres
Last checked 1 hour ago 22 days on the market
At a glance
Description
Discover the last two available villas of the Ruboria project, ideally located in a calm and green environment in Rueyres, close to Bercher, Echallens, and the LEB, which quickly connects to Lausanne. These two adjacent 6.5-room villas seduce with their beautiful volumes, luminosity, ideally oriented gardens, and long-term outlook on the surrounding countryside. One of the villas notably benefits from a vast private garden of about 220 m², rare in the region. Modern construction in traditional masonry, heating by heat pump with photovoltaic panels, underground garage, and current energy performance: everything has been designed to offer comfort, tranquility, and quality of life in the long term. Permit delivered and start of work in September 2026 - delivery planned for summer 2028. Last available corner villas, with basement and direct access to parking. 2 additional indoor spaces: CHF 35,000.-/space. Sale by building plan, share of land. Detailed plans and complete files are available at the agency. Contact us to discover the project and reserve one of the last available opportunities.
Features & amenities
All characteristics
Equipment
Condition & location
Dimensions
Location & surroundings
- Bus Rueyres VD, croisée 133 m
- Bus Rueyres VD, Le Dejors 214 m
- Bus Pailly, Moulin-Pacot 615 m
- Bus Bercher, gare 706 m