Key figures
At a glance
- Year built
- 2026
As stated in the listing.
Description
HoemelStone-Wald – Ihr neues Zuhause in Wald ZHMit grosser Freude teilen wir mit: Der Bau von «HoemelStone-Wald» hat im Mai 2026 begonnen! Damit ist ein wichtiger Meilenstein erreicht und die Realisierung unseres besonderen Neubauprojekts in Wald ZH schreitet sichtbar voran.Den aktuellen Baufortschr...
What do the neighbours pay?
More about this property
Some details are shown to signed-in users. A free account is all it takes.
- What the neighbours pay – comparison and price history
- Location score, transport access and building data – where available
- Which portals this listing appears on
Location & surroundings
Road noise by day (6 am–10 pm), in dB(A)
- 40 to 44.9 dB(A)
- 45 to 49.9 dB(A)
- 50 to 54.9 dB(A)
- 55 to 59.9 dB(A)
- 60 to 64.9 dB(A)
- 65 to 69.9 dB(A)
- 70 to 74.9 dB(A)
- 75 dB(A) and above
From 60 dB(A), the noise reaches or exceeds the limit for purely residential zones (sensitivity level II). Source: FOEN, sonBASE.
The interactive map can’t be loaded here.
Taxes
Annual tax burden in Wald (ZH) for your household.
Source: Swiss Federal Tax Administration (FTA)
Advertiser
Found on urbanhome.ch
Contact goes directly through the original listing.
You contact the advertiser directly on urbanhome.ch.
Last checked 18h ago · 59 days on the market