New construction project Areal Zinzikon - six spacious row houses
Binzhofstrasse , 8404 Winterthur
Last checked 8 hours ago 128 days on the market
At a glance
Description
Valid building permit available - four houses are definitively reserved In the southwestern part of the property, directly on Binzhofstrasse, six high-quality and family-friendly row houses are being built. The sustainable construction method with an elegant concrete base and a wooden structure above combines modern architecture with ecological responsibility. The property is located in a preferred residential area on the sunny eastern slope of the Lindberg. The quiet surroundings and proximity to untouched nature create a unique living experience. From the living areas and the southwest-facing rooms, you can enjoy a beautiful, unobstructed view. The exterior area is shielded from the street by a hedge and offers a lot of privacy. The row houses have four floors: the basement, ground floor, upper floor, and attic. The basement has direct access from the underground garage. A spacious cellar room and the staircase to the ground floor complete this floor. In the northeastern part of the ground floor, the house entrance with cloakroom, guest toilet, and dining area are arranged, while the living area is located in the southwestern part. In between, a very spacious, open kitchen is designed. On the upper floor, there are two bedrooms available. One of the rooms is facing northeast, the other southwest. In the central area of this floor, there is the access zone and two wet cells. One is equipped with a bathtub, the other with a walk-in shower. In the northeastern wet cell, instead of a second sink, the laundry tower is arranged. On the attic floor, which has a skylight on the northeastern and southwestern sides, a very spacious room is designed. The podium at the staircase, from which access to the room is gained, is also naturally lit by a skylight. The overall project includes, in addition to the row houses, the listed farmhouse in the northern part of the property, which is being carefully converted into five stylish rental apartments. The ensemble is complemented by a small multi-family house with five rental apartments, which is being built northwest of the row houses. Construction will start in winter 2026/2027, and completion is scheduled for summer 2028.
Features & amenities
All characteristics
Equipment
Condition & location
Dimensions
Location & surroundings
- Bus Römertor 127 m
- Bus Römertor 141 m
- Bus Im Geissacker 185 m
- Bus Im Geissacker 245 m